Debugging and commissioning of Vibration Feeder

Welcome Forums Main Forum Introductions Debugging and commissioning of Vibration Feeder

This topic contains 0 replies, has 1 voice, and was last updated by Profile photo of aggregate crushing aggregate crushing 2 years, 10 months ago.

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #47208
    Profile photo of aggregate crushing
    aggregate crushing
    Participant

    The electromagnetic vibrating feeder should take debugging and commissioning soon after becoming mounted; altered electric vibration equipment really should choose idling working for four several hours repeatedly beneath the problem of voltage, current and amplitude worth are ordinary, For the duration of procedure, the values of existing and amplitude ought to be stable except by natural means fluctuate with community voltage, Unadjusted electromagnetic vibration equipment can not be place into support,

    Adjustments include things like the subsequent content:
    (1) Air gap amongst iron core and armature be ought to checked and modified to one,9-2, [url=http://www.mobileorecrusher.com/crushing-solutions/rock-crusher-for-lease-in-fiji.html]Rock Crusher For Lease In Fiji[/url]
    ,2 MM; it should be parallel and clear fully; just after adjustment, make sure you tighten bolts, As well big air gap may perhaps enhance latest and minimize vibration; on the contrary, far too modest air gap might guide to collision of iron main and armature; so, any influence phenomenon between iron main and armature is authorized,
    (2) Tuning of spring established: Spring account of spring established is selected in accordance with the tuning values Z, [url=http://www.mobileorecrusher.com/crushing-solutions/stone-crusher-from-india.html]Stone Crusher From India[/url], Tuning of the feeder is developed to become Z=ω/ω0 =0,9, If tuning benefit is less than 0,9, it will lower the feeding capacity; if higher than this price, material conveying will be not stable; so we ought to make changes carefully and continuously, [url=http://www.mobileorecrusher.com/crushing-solutions/small-jaw-rock-crusher-for-sale.html]Small Jaw Rock Crusher For Sale[/url]
    , Soon after the adjustment of air hole, tighten fastening screw of iron main and top screw of spring set, loosen access screw, plug into power supply and adjust potentiometer knob to gradually maximize amplitude; meanwhile, watch out the amplitude shown in amplitude signs to make the present-day and amplitude reach rated price,
    (3) Stability and reliability of electromagnetic vibrating feeder largely depends on the fastening degree of fastening screw of iron core and top screw of spring established, So it is required that check and tighten all top screws, fastening screw and nuts within just the first week until equipment operates stably,